Skip to content

Mikes Collection of Random Projects

Random Projects or things I'm interested in

  • Reef Tank
  • Kayak Building
  • Photography
  • Latest Posts
  • Home
  • 2022
  • January
  • 9
  • Panels 3/4 Stitched

Panels 3/4 Stitched

Posted on January 9, 2022September 14, 2022 By Mike No Comments on Panels 3/4 Stitched
Kayak Building, Taalak

These panels were designed based on the original Ta’al SUP. I stretched them along with the bottom panels, than I went to figure out how the internal framing needed to be modified. After studying various other fishing Kayaks I figured out how much these panels would have to go and I used the internal panels to move the points of panels 3/4

First 4 panels stitched together, shape is looking nice

They look to have gone on pretty well

Post navigation

❮ Previous Post: Taalak under way!
Next Post: Complete Hull stitched together ❯

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Recent Posts

  • Woodbie in Action
  • Completed Kayak – Naming her the Woodbie
  • Painting the Kayak
  • Finishing touches on the Guardian
  • Cockpit and storage areas

Tags

2-part polyerethane B&W Bank of montreal boat design brock string cockpit diy kayak epifanes eye therapy Fiberglass Fillet fillets gtvt gtvt large jem watercraft kayak Kayak build kayak complete maroske maroske fittings mlt mlt patched paper mockup raka epoxy Recessed handle s&g kayak Sabal 12 sabalo 12 sanding Scarfing Scarfing plywood Scupper holes sit on top kayak build stitch and glue Stitch and glue kayak Stitching taalak tankwell The Junction week 1 week 1 day 2 week 1 day 3 week 1 day 4 wood kayak Wood kayak build

Categories

  • Eye Therapy
  • Informational
  • Kayak Building
  • Photography
  • Sabalo 12 MK1
  • Taalak

Archives

  • September 2022
  • August 2022
  • July 2022
  • February 2022
  • January 2022
  • October 2021
  • June 2021
  • January 2021
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020

Archives

  • September 2022 (2)
  • August 2022 (3)
  • July 2022 (1)
  • February 2022 (2)
  • January 2022 (2)
  • October 2021 (5)
  • June 2021 (1)
  • January 2021 (1)
  • November 2020 (2)
  • October 2020 (4)
  • September 2020 (4)
  • August 2020 (4)
  • July 2020 (5)

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Categories

Eye Therapy (5) Informational (1) Kayak Building (27) Photography (1) Sabalo 12 MK1 (17) Taalak (13)

Tags

2-part polyerethane (1) B&W (1) Bank of montreal (1) boat design (2) brock string (5) cockpit (1) diy kayak (2) epifanes (1) eye therapy (5) Fiberglass (1) Fillet (1) fillets (1) gtvt (5) gtvt large (5) jem watercraft (2) kayak (2) Kayak build (3) kayak complete (1) maroske (1) maroske fittings (1) mlt (5) mlt patched (5) paper mockup (2) raka epoxy (1) Recessed handle (2) s&g kayak (1) Sabal 12 (1) sabalo 12 (2) sanding (1) Scarfing (1) Scarfing plywood (2) Scupper holes (1) sit on top kayak build (1) stitch and glue (4) Stitch and glue kayak (2) Stitching (1) taalak (3) tankwell (1) The Junction (1) week 1 (5) week 1 day 2 (1) week 1 day 3 (1) week 1 day 4 (1) wood kayak (5) Wood kayak build (1)

Copyright © 2025 Mikes Collection of Random Projects.

Theme: Oceanly by ScriptsTown