Skip to content

Mikes Collection of Random Projects

Random Projects or things I'm interested in

  • Reef Tank
  • Kayak Building
  • Photography
  • Latest Posts
  • Home
  • Latest Posts
  • Page 2

Latest Posts

Week 1 Day 5

Posted on October 8, 2021October 8, 2021 By Mike No Comments on Week 1 Day 5
Eye Therapy

This content is restricted.

Week 1 Day 4

Posted on October 8, 2021October 8, 2021 By Mike No Comments on Week 1 Day 4
Eye Therapy

This content is restricted.

Week 1 Day 3

Posted on October 8, 2021October 8, 2021 By Mike No Comments on Week 1 Day 3
Eye Therapy

This content is restricted.

Week 1 Day 2

Posted on October 4, 2021October 4, 2021 By Mike No Comments on Week 1 Day 2
Eye Therapy

This content is restricted.

Week 1 Day 1

Posted on October 3, 2021October 3, 2021 By Mike No Comments on Week 1 Day 1
Eye Therapy

This content is restricted.

Kayak is finally Done!

Posted on June 7, 2021June 7, 2021 By Mike No Comments on Kayak is finally Done!
Kayak is finally Done!
Kayak Building, Sabalo 12 MK1

Took the winter off. Garage was too cold and just didn’t have the mood to work on something we couldn’t use right away. The warm weather brought about some excitement to finish this project off and I ended up leaving it a little late. Lets get it out of the way. Full boat shot Love … Read More “Kayak is finally Done!” »

Bank of Montreal @ the Junction

Posted on January 9, 2021May 25, 2021 By Mike No Comments on Bank of Montreal @ the Junction
Photography

I say it a couple times every year. I need to take more photos. So today I took out the camera, blew off the dust and I’ve decided to start up a photo blog again. Old style buildings are fun in Toronto. We don’t have a lot of history or old buildings in the city. … Read More “Bank of Montreal @ the Junction” »

Closing off the Kayak and Recessed Handles

Posted on November 30, 2020 By Mike No Comments on Closing off the Kayak and Recessed Handles
Closing off the Kayak and Recessed Handles
Kayak Building, Sabalo 12 MK1

The first recessed handle took like a week to make. I guess I did learn a lot from the first one, as I was able to knock out the 2nd in 1 night. I than had to cut a hole in the front and rear decks to accommodate the recessed handle. The shoulder of the … Read More “Closing off the Kayak and Recessed Handles” »

Mounting the cockpit and tankwell

Posted on November 30, 2020 By Mike No Comments on Mounting the cockpit and tankwell
Mounting the cockpit and tankwell
Kayak Building, Sabalo 12 MK1

Sorry, updates have been very delayed and lacking. I’ve also not taken too many photos. I think after a while its just a lot of little details and the Kayak didn’t look too different. For this post we’ll talk about mounting the tankwell and cockpit. A few things had to be done before that happened. … Read More “Mounting the cockpit and tankwell” »

Interior Fiberglass and frames

Posted on October 19, 2020 By Mike No Comments on Interior Fiberglass and frames
Interior Fiberglass and frames
Kayak Building, Sabalo 12 MK1

Ok, fiberglassing the interior I thought was gonna be fast and easy. Since looks don’t really matter. Turns out I was wrong as usual. Basically it felt like as soon as you did one section it would tug a bit on another section and the fillet areas would always end up with air bubbles. Near … Read More “Interior Fiberglass and frames” »

Posts navigation

Previous 1 2 3 4 Next

Recent Posts

  • Woodbie in Action
  • Completed Kayak – Naming her the Woodbie
  • Painting the Kayak
  • Finishing touches on the Guardian
  • Cockpit and storage areas

Tags

2-part polyerethane B&W Bank of montreal boat design brock string cockpit diy kayak epifanes eye therapy Fiberglass Fillet fillets gtvt gtvt large jem watercraft kayak Kayak build kayak complete maroske maroske fittings mlt mlt patched paper mockup raka epoxy Recessed handle s&g kayak Sabal 12 sabalo 12 sanding Scarfing Scarfing plywood Scupper holes sit on top kayak build stitch and glue Stitch and glue kayak Stitching taalak tankwell The Junction week 1 week 1 day 2 week 1 day 3 week 1 day 4 wood kayak Wood kayak build

Categories

  • Eye Therapy
  • Informational
  • Kayak Building
  • Photography
  • Sabalo 12 MK1
  • Taalak

Archives

  • September 2022
  • August 2022
  • July 2022
  • February 2022
  • January 2022
  • October 2021
  • June 2021
  • January 2021
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020

Archives

  • September 2022 (2)
  • August 2022 (3)
  • July 2022 (1)
  • February 2022 (2)
  • January 2022 (2)
  • October 2021 (5)
  • June 2021 (1)
  • January 2021 (1)
  • November 2020 (2)
  • October 2020 (4)
  • September 2020 (4)
  • August 2020 (4)
  • July 2020 (5)

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Categories

Eye Therapy (5) Informational (1) Kayak Building (27) Photography (1) Sabalo 12 MK1 (17) Taalak (13)

Tags

2-part polyerethane (1) B&W (1) Bank of montreal (1) boat design (2) brock string (5) cockpit (1) diy kayak (2) epifanes (1) eye therapy (5) Fiberglass (1) Fillet (1) fillets (1) gtvt (5) gtvt large (5) jem watercraft (2) kayak (2) Kayak build (3) kayak complete (1) maroske (1) maroske fittings (1) mlt (5) mlt patched (5) paper mockup (2) raka epoxy (1) Recessed handle (2) s&g kayak (1) Sabal 12 (1) sabalo 12 (2) sanding (1) Scarfing (1) Scarfing plywood (2) Scupper holes (1) sit on top kayak build (1) stitch and glue (4) Stitch and glue kayak (2) Stitching (1) taalak (3) tankwell (1) The Junction (1) week 1 (5) week 1 day 2 (1) week 1 day 3 (1) week 1 day 4 (1) wood kayak (5) Wood kayak build (1)

Copyright © 2025 Mikes Collection of Random Projects.

Theme: Oceanly by ScriptsTown